Project Aim and Challenges
The Canal & River Trust’s Design Team approached Polydeck to explore solutions for improving access across seven weirs along the Rochdale Canal in Calderdale.
The existing weirs effectively act as fords, with water flowing over the crossing points during periods of high water and flooding, with the only means of crossing often being a single narrow plank which creates a significant safety hazard for people using the towpath.
This presents particular difficulties for families with pushchairs and cyclists, restricting access along an otherwise popular walking and cycling route. A more permanent solution was required to provide a safe and accessible crossing at each of the seven locations.
The Canal & River Trust needed to introduce a durable, slip-resistant surface that would improve accessibility without detracting from the scenic surroundings of the canal.
Polydeck’s Solution
With all seven locations set within natural surroundings, the appearance of the finished product was an important consideration alongside its performance and longevity.
Polydeck’s GRP decking was selected for its timber-effect finish, allowing the new crossings to blend naturally into the existing landscape, and the integrated anti-slip surface provides a safer walking surface, even in wet conditions.
Unlike traditional timber, which can deteriorate and become slippery over time, Polydeck’s GRP products offer a design life in excess of 75 years to provide a long-term solution with reduced maintenance requirements and fewer replacement concerns.
The recycled structural foam core also offered an environmental advantage over traditional materials and alternative recycled plastic products, combining the benefits of recycled content with the durability and dimensional stability of GRP.
Project Outcome
The new crossings will provide a more accessible and safer way for people to navigate the Rochdale Canal, helping to remove longstanding barriers for pedestrians, families and cyclists.
By combining a durable, anti-slip walking surface with a natural timber-effect finish, the solution will improve accessibility while blending with the surrounding landscape.
With a design life in excess of 75 years, the GRP decking provides a long-term investment for the Canal & River Trust, reducing the need for ongoing maintenance and future replacements.
A Polydeck boardwalk was installed to span a towpath weir on the Rochdale Canal. It provides a reliable route where canal overflows previously rendered the towpath impassable to many users. The use of a Polydeck solution was successfully approved for installation on the Grade II Listed weir which demonstrates how it integrates with the historic environment without detracting from the setting. The long design life and minimal maintenance requirements of the structure are significant benefits alongside improved accessibility along this section of the canal. The project has been well received by the local community, and similar solutions will certainly be considered for implementation at other locations across the canal network.