The Project
Project Aim and Challenges
Polydeck were approached by Devon County Council to replace timber planks on an existing bridge over a waterway. These needed replacing due to deterioration and failure of the timber panels. Due to the location of the bridge and being in close proximity to water, POLYplank™ was the perfect replacement.
The new bridge deck needed to be durable with a high level of slip resistance as the bridge inclines towards the beach. Timber had been used previously on other projects within the area but proved to have a very limited life span.
To avoid further maintenance and replacements, the council required a long-life cycle, timber effect, and high slip resistance product. With the added benefit of a 100% recycled core, surrounded by a stable GRP outer skin, the chosen POLYplank™ offers a non-warping, non-slip, long life span and aesthetically pleasing surface to the walkway on the bridge.
view our work